Current construction rates
whats the current construction rate in rwp/isb and does it vary from place to place? or almost same rates?
-
- Gold Members
- Reactions:
- Posts: 20
- Joined: Tue Mar 22, 2016 11:45 pm
- Location: Islamabad
- Been thanked: 30 times
- Flag:
- Contact:
- Status: Offline
Re: current constrction rates
The rates vary from location to location some areas in DHA and 100% of Bahria, the construction rates are higher. Due to recent changes in Bahria's rules the construction cost has gone up by 25% as compare to any other location in Islamabad.
Normal grey structure would cost you Rs.1000 per sqft. (depending on your map and site location) In Bahria the minimum is Rs.1250 per sqft for ground portion and Rs.1100 per sqft for first floor.
Normal grey structure would cost you Rs.1000 per sqft. (depending on your map and site location) In Bahria the minimum is Rs.1250 per sqft for ground portion and Rs.1100 per sqft for first floor.
-
- Reactions:
- Posts: 8
- Joined: Tue Mar 22, 2016 1:16 pm
- Location: gujranwala
- Been thanked: 10 times
- Flag:
- Contact:
- Status: Offline
Re: current constrction rates
We are providing best construction services in Islamabad,on veryreason able rates.
Grey structure 1200/sqft
Standard finished 1800/sq ft
Delux 2200/sq ft
Luxury 2500/sq ft
Prices deppended on your drawings of work.
Grey structure 1200/sqft
Standard finished 1800/sq ft
Delux 2200/sq ft
Luxury 2500/sq ft
Prices deppended on your drawings of work.
-
- Reactions:
- Posts: 1
- Joined: Tue Mar 22, 2016 1:17 pm
- Has thanked: 1 time
- Been thanked: 2 times
- Contact:
- Status: Offline
Re: Current construction rates
what ll be the approx. cost for finishing, after completion of grey structure .
-
- Gold Members
- Reactions:
- Posts: 20
- Joined: Tue Mar 22, 2016 11:45 pm
- Location: Islamabad
- Been thanked: 30 times
- Flag:
- Contact:
- Status: Offline
Re: Current construction rates
Finishing depends on your choice of material and design... the finishing starts from Rs.1000 per sqft..
If you want an accurate estimate than contact me with your full requirement.
Best Regards
HT-Builders
If you want an accurate estimate than contact me with your full requirement.
Best Regards
HT-Builders
-
- Reactions:
- Posts: 3
- Joined: Thu Apr 27, 2017 1:19 pm
- Been thanked: 3 times
- Flag:
- Contact:
- Status: Offline
Re: Current construction rates
Yes, construction rate is different, depends on the location. I have experienced it personally and I know the construction company named by Amer Adnan Associates, which helps you regarding construction.
-
- Reactions:
- Posts: 1
- Joined: Wed Dec 27, 2017 4:02 pm
- Flag:
- Contact:
- Status: Offline
Current construction rates
What is the current construction cost per square foot in DHA Karachi PHASE 6 The plot size is 600 yards ,covered area is planned to be 6000 square feet including 200 square feet of basement (servant quarter ).I need cost breakdown as under :
-Labour cost to be charged by contractor per square foot (turn key basis ) including grey structure and finishing .Is Chowkidar provided by contractor and included in labour rate per square feet or is that charged separately .
-Approximate Material cost per square feet .
The construction will be of A type .
Liaquat
-Labour cost to be charged by contractor per square foot (turn key basis ) including grey structure and finishing .Is Chowkidar provided by contractor and included in labour rate per square feet or is that charged separately .
-Approximate Material cost per square feet .
The construction will be of A type .
Liaquat
-
- Gold Members
- Reactions:
- Posts: 41
- Joined: Mon Jan 15, 2018 9:41 am
- Location: Rawalpindi
- Has thanked: 8 times
- Been thanked: 23 times
- Flag:
- Contact:
- Status: Offline
Current construction rates
Construction rates if different , Its Depend upon area.
In Islamabad, The cost for this basic structure is approximately Rs. 1,500 per square foot. Once the grey structure is completed, the finishing touches have a cost of their own. Flooring, tiles, woodwork, paint and other details cost approximately an additional Rs. 1,000 per square foot.
Thanks. !!
In Islamabad, The cost for this basic structure is approximately Rs. 1,500 per square foot. Once the grey structure is completed, the finishing touches have a cost of their own. Flooring, tiles, woodwork, paint and other details cost approximately an additional Rs. 1,000 per square foot.
Thanks. !!
-
- Reactions:
- Posts: 6
- Joined: Wed Mar 07, 2018 7:14 pm
- Location: Islamabad
- Been thanked: 2 times
- Flag:
- Contact:
- Status: Offline
Current construction rates
Contact us for the following service:
1. Construction
2. Renovation
3. Interior
4. Real Estate services
(Bahria Town, DHA, CDA) Islamabad and Rawalpindi Only.
Contact: Mobile / WhatsApp 0300 8562800
M/s. Brick Stone Engineering
1. Construction
2. Renovation
3. Interior
4. Real Estate services
(Bahria Town, DHA, CDA) Islamabad and Rawalpindi Only.
Contact: Mobile / WhatsApp 0300 8562800
M/s. Brick Stone Engineering
Who is online
Users browsing this forum: No registered users and 1 guest